 |
•
|
Westinghouse Nuclear Fuel (Columbia,
SC) – building lighting, power and process equipment |
•
|
Pactiv (Jackson, SC) – building lighting,
power and process equipment |
•
|
Honeywell (Moncure, NC) – process
maintenance |
•
|
Michelin Tire (Lexington, SC) – building
lighting, power and process equipment |
•
|
Pirelli Cable (Lexington, SC) – building
lighting, power and process equipment |
•
|
WRAL-TV (Raleigh, NC) – 48,000
sq. ft. TV station newsroom addition |
•
|
Strom Thurmond Fitness and Wellness Center (Columbia,
SC) – 190,837 sq. ft. center for the University of South Carolina |
•
|
The National Advocacy Center (Columbia, SC) – 262,000
sq. ft. national legal education center |
•
|
Blue Cross Blue Shield (Columbia, SC) – 315,000
sq. ft. insurance processing and call center |
•
|
Lexington County Judicial and Administrative
Centers (Lexington, SC) – 38,000 sq. ft. addition to the Lexington
County Administration Building and a new 98,000 sq. ft. court house |
•
|
Richtex Brick (Columbia, SC) – infrared,
service, motors and controls |
•
|
Milliken (Southeastern Region) – Infrared |
•
|
Pheonix Recycled Products (Batesburg, SC) – service,
motor repair, installation of grinder lines and recycling lines |
•
|
Wal-Mart (Southeastern Region) – service,
fire marshall inspection repairs, video, phone and data line installation |
•
|
Abbeville Hospital (Abbeville, SC) – infrared,
medical equipment installation |
•
|
Bethel ARP Church (Winnsboro, SC) – Replace
existing knob and tubing wiring, electrical service and wiring devices. |
•
|
Ruby Tuesday Restaurant (Columbia, SC) – Furnish,
install, and test nine Level 5E data cables, an isolated ground panel,
and isolated ground receptacles. |
•
|
Bi-Lo St Andrews (Columbia, SC) – Emergency
call out to replace 1600 amp electronic trip unit in circuit breaker.
Generators supplied during power outage. |
•
|
Hueck Foils (Columbia, SC) – Emergency
response to fire in secondary side of pad mount transformer. Facilities
were replaced. |
•
|
Woodruff School System (Woodruff, SC) – Install,
terminate and test 9,000 ft. of six fiber, single mode fiber optic
cable to interconnect District Office, Middle School and High School. |
•
|
Strom Thurmond Wellness Center at University
of South Carolina (Columbia, SC) – Furnish, install, terminate
and test 2,200 ft. of 1500 pair, PE89, copper cable to connect Wellness
Center to Greek Housing and State Building. |
•
|
Leesburg Training Center (Columbia,
SC) – Complete 23 KV infrastructure upgrade converting Overhead
to Underground for electrical, communication, gas, water and drainage
system improvements. |
•
|
SCE&G (Northern, Western, Lowcountry Districts
of SC) – Master contracts for all overhead and underground
distribution work. Includes new business and system improvement. |
•
|
Rust Constructors (Ft. Jackson, SC) – Work
for the Department of Defense to include OH and UG primary, parking
lot lighting and substation work. |
•
|
McCormick CPW (McCormick, SC) – Converted
the town’s outdated 4 KV OH electrical distribution system
to a 12 KV system. |
•
|
NOVEC (Manassas, VA) – Installation of
approximately 43 miles of sensitive ADSS fiber-optic cable along
a difficult route. |
•
|
Sprint (Rocky Mount, NC) – Two
mega watt generator replacement at Rocky Mount Central Office containing
their major equipment and an AT&T Switch. |
•
|
Parsons (SC & NC) – Numerous building
additions at major central
offices for Bellsouth Telecommunications. |
•
|
Bellsouth Telecommunications (various central
offices, SC) – Generator and switchgear replacements, energy
management systems installation and upgrades, and card access systems
installation. |
•
|
Siemens Building Technology (various central
offices, SC) – Fire alarm system replacements and upgrades
for Bellsouth. |
•
|
Palmetto Net (Columbia, SC) – Central
office construction consisting of cable entrance, DC power riser,
rack and frame and fiber management system
installation. |
•
|
Bellsouth (Columbia, SC) – Master
outside plant contract for Columbia and surrounding communities.
All facets of copper and fiber wiring. |
•
|
Level 3 Network Installation (Athens, GA) – Installation
of 52 miles of 15-conduit system for long haul fiber optic cable
network. Includes plowing, trenching, directional and rock boring
(down-hole motor required). |
•
|
FPL FiberNet (Southern Florida) – Engineering,
permitting, and construction for relocation and building lateral
projects through southern Florida, portions in power zone. |
•
|
Southern Telecom (Atlanta, GA) – Installation
of 12-16 conduit system and fiber optic cable in abandoned steam
pipe in the central business district of Atlanta, GA. |
|